1
/
of
1
20 Meter Long Lead
20 Meter Long Lead
Regular price
£19.99 GBP
Regular price
£29.99 GBP
Sale price
£19.99 GBP
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Couldn't load pickup availability
This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use.
Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.
Share
